 | Scheduler improvements |  |
genaldar
Joined: 13 Feb 2006 |
Posts: 0 |
|
|
 |
Posted: Thu Feb 23, 2006 8:40 am |
|
 |
 |
 |
 |
It would be great if the scheduler allowed you to select multiple drives to scan instead of allowing you to scan only 1 at a time. As it works now you have to set up multiple different scheduled scans to scan everything. It would mean either allowing the use of ctrl to select multiple targets or allowing the use of a ; as a divider on the scheduled scan details page.
Thanks
|
|
 | Scheduler needs wakeup |  |
celem
Joined: 05 Mar 2006 |
Posts: 0 |
|
|
 |
Posted: Sun Mar 05, 2006 11:32 pm |
|
 |
 |
 |
 |
The scheduled scans never work on my machines, apparently because there is no wakeup for a sleeping machine.
|
|
 | turn off computer when finnished |  |
urbieta
Joined: 26 Apr 2006 |
Posts: 0 |
|
|
 |
Posted: Wed Apr 26, 2006 2:12 pm |
|
 |
 |
 |
 |
I have clamwin installed on my work computer and it would be swell if I could schedule the antivirus to fully scan at exactly the time I get to leave from work and select an option to TURN OFF THE COMPUTER WHEN FINNISHED SCANNING.
This way it would not interrupt my productivity and would not worry if the office burned out because I left the pc on or something lol
thanks.
|
|
You cannot post new topics in this forum You cannot reply to topics in this forum You cannot edit your posts in this forum You cannot delete your posts in this forum You cannot vote in polls in this forum
|
All times are GMT
Page 1 of 1
|
|
|
Powered by
phpBB © phpBB Group
Design by
phpBBStyles.com |
Styles Database.
Content © ClamWin Free Antivirus GNU GPL Free Software Open Source Virus Scanner. Free Windows Antivirus. Stay Virus Free with Free Software.